MOTOR JIKOV CNG
CZ    EN
Member of MOTOR JIKOV GROUP
Přejít k hlavnímu obsahu webu
MOTOR JIKOV CNG > PRESS RELEASES > Installation of the first MJ Compact Plus filling station at ŽDB Drátovna
Installation of the first MJ Compact Plus filling station at ŽDB Drátovna

December 2013 – CNG filling station of the MJ Compact Plus series was installed and commissioned in the ŽDB Drátovna company in Bohumín.

It is a compact filling station for fast refuelling of vehicles with compressed natural gas, with a total power of 40 m3 per hour, and includes a 1,680 l double section storage tank. Maximum capacity is 400 kg of natural gas per day, and 300 g of compressed natural gas kept in storage tanks for fast filling. CNG is filled using the ADAST V Line Major dispenser with high user comfort. The station will serve for filling fork-lift trucks provided by Linde Material Handling ČR.

ŽDB Drátovna has been a subsidiary company of Třinecké železárny – Moravia Steel since 2012, when it was separated from ŽDB Group. It includes the following plants – unpatented wire-drawing plant (low carbon), patented wire-drawing plant (high carbon), steel cord production plant, steel wire rope mill, spring plant and wire products plant. The company has a tradition of over 125 years and is one of the leading manufacturers in the field.

www.dratovna.cz/czech/